June 21, 2006
Our electrician arrived to work on the wiring in the house. He was supposed to have come last Saturday, but he couldnÂ’t make it. HeÂ’s doing this on the side and his employer had an emergency job to do. Tonight was the first night he was able to get over to start. HeÂ’s not finished, he has a lot of work to do, but he did get a good chunk out of the way. BTW, may the powers that be shine down on him. He started tearing into the electrical and noticed that the external wiring all the way through the meter was already gauged correctly. He checked with the city inspector, and now doesnÂ’t have to move the meter. Our meter is in the basement, not on the outside of the house like most new ones. That means he is saving me even more money, and cutting a good 5 hours of work out of the job.
He did take a break tonight to admire my truck, which Ktreva found amusing. He has an old 70’s Chevy and was digging on Janine. We talked specs and checked out the features. For the rest of the night he kept saying, “God, that’s a nice truck.” I do believe he has truck envy.
Friday the heating and cooling company is coming to install the air conditioner. That means no more hot sweaty nights and weekends in the house. Maybe people will actually come over during the summer now since they wonÂ’t have the meat baked off of their bones. In order for this to be installed, I have to take the whole day off. However, they tell me that if they get here at 8:00 AM and there are no problems they should be done by 10 at the latest. That means that if anyone wants to help spot me doing bar curls Friday afternoon, say at a local wing joint, let me know! (hint hint hint)
Posted by: Contagion at
06:30 PM
| No Comments
| Add Comment
Post contains 424 words, total size 2 kb.
61 queries taking 0.1166 seconds, 162 records returned.
Powered by Minx 1.1.6c-pink.








